Prestedge Retief Dresner Wijnberg were appointed by ESKOM during the initial site data collection programme and investigation of alternative intake and outfall options phase of the project during the early 1970’s. The directors of the firm have had a long standing involvement with the marine aspects of the Koeberg Nuclear Power Station since then.
PRDW have been involved in the site data collection, feasibility studies, licensing reports, in addition to the detailed design of the breakwaters, pump house structures and the cooling water outfall. Work included physical model and mathematical model studies.